Contracted by the Airline to move the TTSL 737 FFS from their training centre in Coalville, Leicestershire, UK to a new facility at London Heathrow, Rotran completed the move from power off to power on, including modifications to both hydraulic and cable runs, in 29 days with JAA Qualification GC CAA Level 4 obtained 6 days later.
map.htm map.htm map.htm map.htm map.htm
Click on each action photo to view on a larger scale.
A pop-up window will appear in the top left of your screen. Please remember to close the pop-up to view another photo

"The installation took five weeks from shutdown to CAA level 4 Approval, which, considering the major catenary and drawbridge modifications was a magnificent achievement. The quality of the installation was also first class."

Richard Seymour
Flight Simulator Technical Manager
British Midland